State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: PIPARHA
Work Code: 1713004013/SK/2105 (Bharat Nirman Rajeev Gandhi Sewa Kendra,PIPARHA)
Work Category: Sewa Kendra
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 2/10/2013 Work start date : 14/2/2014
Present status : Not Existing Proposed Status : New Construction
Tech Sanction Details
Technical Sanction No. : 1541 Sanction Date : 27/12/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
264000 285000 736000 0 0 0 0 1021000 0 1285000
Financial Sanction Details
Financial\Administrative Sanction No: 1541/13 Financial\Administrative Sanction Date 27/12/2013
Fin. Sanc. Amt. (in Rs) NREGA:1285000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1285000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil73.3870.65180.628
2Filling foundation and around masonry work with moorum I/c ramming layers and watering.69.55145.410112.57
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)56.2383007.5169135.785
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)37.532068.177615.793
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:5:10 (1 cement, 5sand, 10metal)1.5431847.62850.8468
6Labour only for item no. 0413 (for any proportion of cement concrete)54.078402.121744.7638
7Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used2.16226.8489.888
8False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift348.694163.957150.9466
9False work for R.C.C. and P.C.C. work in plinth and foundation131.08126.216542.296
10Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:4 (1cement, 4sand)2.072324.44811.508
11Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:5 (1cement, 5sand)34.7882299.679998.4848
12Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)5.742179.312509.182
13Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height124059.473656
14Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars5306.58851.1271166.6468
15Providing and fixing in position collapsible steel shutters with vertical channels 20mm x 10mm x 2mm braced with flat iron diagonals 20mm x 5mm size with top and bottom rails of T-iron 40mm x40mm x6mm with 38mm dia steel pulleys complete with bolts and nu11.342906.732961.978
1615mm thick cement plaster on rough side of wall in-Cement mortar 1:4 (1cement, 4sand)12.4898.51229.28
1715mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand)514.02585.844103.345
18Extra for providing and fixing glass strips in joints of floors-40 mm wide 4 mm thick.303.27815.34640.1534
19White glazed tiles 6mm thick in flooring, treads of steps and landings laid on a bed of 12mm thick cement mortar 1:3 finished with flush pointing in white cement.134.79622.583906.775
20Cement washing (Portland cement) 3 coats.-White cement660.13314.99835.9817
21Snowcem or durocem painting of any shade-2 coats on new work158.7312.11920.633
22Painting with enamel paint, brushing, interior to give an even shade I/n cleaning the surface of all dirt dust and other foreign matter on steel and other metal surfaces.-3 coats29.21100.32929.763
23Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.42.6776.433074.64
24Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.69.55331.5623059.998
25Transportion of metal108.7634.02968918.9523
26transportion of sand78.5639.3650189.76
27TRANSPOTATION OF CEMENT27.39187.565137.2684
28Electrification of RGSK16800068000
29Internal Water supply ans sanitary fitting15200052000
Total Activity 1285000
S.NoMaterialQuantityUnit PriceTotal
120 MM METAL74.17125092712.5
240 mm Metal34.53120041436
3Bricks213003.778810
4CEMENT(BEGS)587265155555
5Convergence Amount1285000285000
6iron bar5306.5943228183.37
7Sand114078.3489307.6
8Transportation charges14900049000
Total Material 1021000