Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 25-Jun-2024 11:03:02 AM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: SAROLA
Work Code: 1725007067/WC/22012034392072 (तालाब निर्माण सारोला लखन शिवराम के खेत के पास)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2018 Work start date : 1/5/2018
Present status : Non-existent Proposed Status : Construction of Mini Percolation Tank for Comm
Tech Sanction Details
Technical Sanction No. : 09ts Sanction Date : 1/5/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
1112000 386000 0 0 0 0 0 386000 0 1498000
Financial Sanction Details
Financial\Administrative Sanction No: 01 as Financial\Administrative Sanction Date 1/6/2018
Fin. Sanc. Amt. (in Rs) NREGA:1498000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1498000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil10.711347.38121416.966
222cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014260.4175.545700.2
3Surface dressing two coats with paving bitumen using 18kg. of bitumen 80/100 per 10sqm with 0.15cum of stone chipping 13.2mm nominal size per 10sqm for 1st coat and 11kg. of bitumen 80/100 per 10sqm with 0.10cum of stone chipping 11.2mm nominal size per 117211219264
4Lossening of hard soil by ploughing the existing gound2.72352263509.4
5Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed50235221176100
6work charge17128271282
Total Activity 1498000
S.NoMaterialQuantityUnit PriceTotal
1Convergence Amount71477171477
2pitching stone11500015000
3Transportation charges1023522235220
4Transportation soil2.72352263509.4
Total Material 386000