S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Dag-beling-Single spade stroke minimum 75mm deep | 4000 | 0.14 | 560 |
2 | Applying of Chemical Fertilizer including cost of Materials, Conveyance etc. | 0 | 0 | 0 |
3 | contingency | 1 | 3211.5 | 3211.5 |
4 | Digging of pits.for fencing pole and fitting work 0.30X0.30X0.45=0.0405 per pole | 110 | 23.35 | 2568.5 |
5 | Fencing with spick shrubes minimun 1.6m. height around the plant. | 220 | 15 | 3300 |
6 | Preperation of pits for plantation of poly plants including mixing of soil manure fertilizer and insecticides with first watering etc. complete. | 110 | 10 | 1100 |
7 | All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala construction, earthing up etc.e with securty for first year per 675 plants. | 300 | 122 | 36600 |
8 | All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for second year per 675 plants. | 200 | 122 | 24400 |
9 | All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for thirdyear per 900 plants. | 180 | 132 | 23760 |
10 | Purchasing of GI wire as per MPLUN Specification. | 7.5 | 100 | 750 |
11 | Supplying of Bamboo tree guard in triangular in shape each jali size 1.65 m x 0.45 m having with horizontal and verticle cross members maximum spacing 7.5cm x 7.5 cm to protect from goat / cattles. | 110 | 260 | 28600 |
12 | Supply of farm yard mannure (FYM) to the plantation site. | 110 | 10 | 1100 |
13 | Supply of vermi compost | 100 | 6 | 600 |
14 | Supply of singal super phosphate (SSP) | 50 | 4 | 200 |
15 | Supply of muriate of potash (MOP) | 50 | 6 | 300 |
16 | Supply of urea. | 50 | 6 | 300 |
17 | Supply of Neem cake | 22 | 20 | 440 |
18 | Supply of Themate, phorate 10 G pesticites | 3 | 80 | 240 |
19 | Supply of foresty or horticulture Plant cost graffted 2 to 3 feet . height | 165 | 15 | 2475 |
20 | Transport of plants from nursury to plantation site upto 40 km. including loading and unloading | 500 | 4 | 2000 |
21 | Supply of Plant protection pesticides per plant, a-foresty plant, b- fruit plant. | 330 | 10.5 | 3465 |
22 | Rent for diesel generator working 6-8 hour avarge for lifting of water for Irrgation of plants per month. | 18 | 500 | 9000 |
23 | Supply of farm yard mannure (FYM) and fartilizer second year per plant | 220 | 11.5 | 2530 |