S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Lime Mortar 1:2 ( 1 lime putty, 2sand ) | 245 | 280 | 68600 |
2 | Lime Surkhi Mortar 1:2 ( 1 lime putty, 2 surkhi,) | 45 | 1209 | 54405 |
3 | Cement Lime Mortar 1:1:5 ( 1 cement, 1 lime putty, 5 sand ) | 120 | 1290 | 154800 |
4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 76.75 | 74 | 5679.5 |
5 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 2.77 | 3235.4 | 8962.058 |
6 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size) | 19.07 | 4253 | 81104.71 |
7 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars | 691.2 | 52.3 | 36149.76 |
8 | Providing and fixing to wall, ceiling and floor 6.00kgf/sqcm working pressure polyethylene pipes of the following outside diameter high density complete with special flange compression type fitting wall clips etc. including making good the wall ceiling an-40 mm dia. | 1 | 69000 | 69000 |
9 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 75.36 | 186 | 14016.96 |
10 | Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting) | 19.23 | 698.2 | 13426.386 |
11 | Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting. | 11.87 | 912.6 | 10832.562 |
12 | Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m | 11.87 | 1287.9 | 15287.373 |
13 | Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Hard moorum | 1 | 0 | 0 |
14 | 1902 Transportion of metal | 15 | 149 | 2235 |