Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 04:45:06 AM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: KHARWA
Work Code: 1725006029/WC/22012034696586 (CTR रूफ वाटर हार्वेस्टिंग निर्माण कार्य H M ROOM M S शाला खारवा )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 1/4/2021 Work start date : 16/4/2021
Present status : Existing Proposed Status : Roof top rain wat. har. str. in gov/panchayat bldg
Tech Sanction Details
Technical Sanction No. : 1725006/2021-2022/314021/TS Sanction Date : 7/6/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
12029.26 10412.52 312.43 783.9 0 0 0 11600 0 23538.11
Financial Sanction Details
Financial\Administrative Sanction No: 1725006/2021-2022/314021/AS Financial\Administrative Sanction Date 7/6/2021
Fin. Sanc. Amt. (in Rs) NREGA:23538 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
23600
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m2758.51777777777781579.98
2(j) Cement mortar 1:6 (1cement, 6sand)13873.863873.86
3(d) Cement mortar 1:6 (1cement, 6sand)20139.84652796.93
4(h) 4.0 Km. Lead6.75159.7511111111111078.32
5(V) 2.5 Km. Lead13.5151.8807407407412050.39
6(IV) 2.0 Km. Lead6.75111.754074074074754.34
7Providing and fixing on wall face unplasticised Rigid PVC Rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. (ii) 110 mm diameter (minimum wall thickness 2.2mm)10231.12311
8(b) Dense or hard soil27.6148.3333333333334094
9Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.13.5163.5674074074072208.16
10Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.6.75228.1214814814811539.82
11Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry.6.75185.3762962962961251.29
Total Activity 23600
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.027588524.3375
20084-Hire charges of Diesel truck - 9 tonne (without POL)0.93222422089.544
30367-Portland Cement0.13755511757.7625
40983-Fine sand (zone IV)0.58851076.25633.373125
51235-Diesel oil7.354168500.0788
65001-Mobil oil0.2611182.947.75519
77900-Modular common burnt clay bricks of class designation 7.55204.132147.6
8MR11640-uPVC Pipe (Working Pressure 4kg/cm square) single socketed pipe 110mm dia101601600
9MR11641-uPVC Pipe (Working Pressure 4kg/cm square) rubber (seal) ring 100mm dia1.66672541.6675
Total Material 7900