Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:28:57 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: SINGHARAN(P)
Work Code: 1703004078/RS/22012034427814 (nali nirman-chandan prajapati ke makan se munni ke makan ki or singharan)
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2018 Work start date : 5/9/2018
Present status : Existing Proposed Status : Constr of Open/Covered Grey Water Drain for Comm
Tech Sanction Details
Technical Sanction No. : 078/1845 Sanction Date : 31/7/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
80715 41956 0 0 0 0 0 42000 0 122671
Financial Sanction Details
Financial\Administrative Sanction No: 078/13 Financial\Administrative Sanction Date 1/8/2018
Fin. Sanc. Amt. (in Rs) NREGA:122600 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
123000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)52.756.252964.375
2Dag-beling-Single spade stroke minimum 75mm deep0.310030
3Dag-beling-Double spade "v" shaped stroke 100mm deep0.310030
4Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.88211.259922.5
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)3307.45.6318620.662
6Labour only for item no. 0413 (for any proportion of cement concrete)4585.632578.54
7False work for R.C.C. and P.C.C. work in plinth and foundation147.8101478
8Labour only for item no 0504326
9Coursed rubble masonry second sort in plinth and foundation.-In Cement mortar 1:8 (1cement, 8sand)2082.133.7570270.875
10Labour only for item no.1031, 1032 and 1033-Ruled pointing50.15250.5
11Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing78.55392.5
12Rammed moorum flooring88211.259922.5
13Cutting out cracks of roof terrace to V-Section, cleaning out wetting, grouting with cement and sand slurry 1:3 (1 cement, 3 sand)54.610546
14Collection of puddle earth including stacking at quarry2052.51050
15Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed13964.3753964.375
Total Activity 123000
S.NoMaterialQuantityUnit PriceTotal
120mm Chips355.74.781700.246
240 mm Metal136.711.251537.875
3Cement75.3230022596
4Convergence Amount11055610556
5Gravel or moorum123.033.38415.8414
6SAND259.8319.615095.2663
Total Material 42000