S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Contingency | 1 | 50013.07 | 50013.07 |
2 | Dag-beling-Single spade stroke minimum 75mm deep | 800 | 0.3 | 240 |
3 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 45 | 871 | 39195 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 42 | 3134.4 | 131644.8 |
5 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 417 | 983.7 | 410202.9 |
6 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 120 | 65.9 | 7908 |
7 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Raised and cut pointing | 1200 | 113.8 | 136560 |
8 | Transportation of 20 MM metal | 35.7 | 515.5 | 18403.35 |
9 | Transportation of sand | 22.62 | 112.05 | 2534.571 |
10 | Transportation rates for Masonry stone. | 417 | 446.74 | 186290.58 |
11 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 45 | 237.7 | 10696.5 |
12 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 200.75 | 100.3 | 20135.225 |
13 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil | 225 | 95 | 21375 |
14 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 0 | 0 | 0 |