State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: KORATA
Work Code: 1711006051/LD/22012034592747 (PASHU ABRODHAK WAL AMIR CHAND KE KHET SE KISAN KE KHET TAK)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 27/6/2023 Work start date : 20/7/2023
Present status : Not Exist Proposed Status : Construction of Stone contour Bund for Community
Tech Sanction Details
Technical Sanction No. : 1711006/2023-2024/109687/TS Sanction Date : 22/7/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
672452.62 385213.94 728.76 30009.75 0 0 0 416000 0 1088405.07
Financial Sanction Details
Financial\Administrative Sanction No: 1711006/2023-2024/109687/AS Financial\Administrative Sanction Date 22/7/2023
Fin. Sanc. Amt. (in Rs) NREGA:1088406 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1089000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.37757.6093165562913928725.17
2(III) Lead upto 200 meters1055.792126.363384075651133413.45
3Filling foundation, around masonry work, plinth, sides of foundation etc. with moorum I/c ramming layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m.263.948272.56743752557371943.63
4Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15) (a) C.C. 1:2:4 (1cement, 2sand, 4metal)29.4454408.24554253693129800.79
5(c) Masonry stones, pitching stones or boulders1055.79250.570320669222753391.74
6(XXXI) 70 Km. Lead25.028845.80070321240221168.7
7(VI) 3.0 Km. Lead1055.792151.317560655887159759.87
8(X) 5.0 Km. Lead6.478168.53967273851091.8
9(XXX) 60 Km. Lead12.661682.0116894400138634.95
10Labour only for boulder soling hand packed excluding consolidation.1055.792215.827719853911227869.18
11(b) Dense or hard soil317.1169.8530747398353860.41
12Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.1055.792187.297497992029197747.2
Total Activity 1088000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper2.944510002944.5
20084-Hire charges of Diesel truck - 9 tonne (without POL)40.1559237210084327.43977
30297-Stone Aggregate(single size): 10 mm nominal size3.238956502105.3175
40367-Portland Cement9.71685640062187.84
50810-Moorum263.94818047510.64
60983-Fine sand (zone IV)13.25025102513581.50625
71235-Diesel oil423.1401630810042314.016308
83-Display Board / CIB110001000
95001-Mobil oil15.189537592704101.1751493
10MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)21.789379017213.547
Total Material 278000