State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: SEMALYA RAIYAT
Work Code: 1725007069/RC/22012034217372 (खेत सडक योजनान्‍तर्गत ग्रेवल मार्ग निर्माण कार्य स)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/2/2014 Work start date : 25/4/2014
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 1983QQ, Sanction Date : 22/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
782000 709000 0 0 0 0 0 709000 0 1491000
Financial Sanction Details
Financial\Administrative Sanction No: 63QQ, Financial\Administrative Sanction Date 5/3/2014
Fin. Sanc. Amt. (in Rs) NREGA:1491000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1491000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.51004.120910
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)2.73296.48900.28
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)29.242478.272462.568
4False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift70.04199.713986.988
5Extra for nosing in steps in treads with fine dressed and rubbed sand stone slab.28500.51425
6Transportation of metal 12350023500
7Transportation of metal 2465120.69297500.85
8Transportation of metal 270.9156.9842525.882
9Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7246523.658174
10Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.12.52835.635445
11Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making109019.120819
12Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact246523.758420.5
13Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau382.5721.7276050.25
14Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:127.5349.144510.25
15Site clearance, cutting grass, raking into heaps and removing off the premises109081.288508
16Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work38315960897
17Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work38315960897
18Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work6915910971
19Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Dense or hard soil (PT/30/30)6.75105708.75
20Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Tank Work15.5888.31375.714
21Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)2465118.8292842
Total Activity 1491000
S.NoMaterialQuantityUnit PriceTotal
112mm Chips12002.32760
22043 soil Compaction material246521.3352578.45
32048-Construction of gravel ba427.5433.02185116.05
42049-Construction of gravel su127.5261.833379.5
540 mm metal(1.3.6)26.3100026300
6Cement10630031800
7Centering and Shuttering124809920
8contangency and work charges190009000
9Display board110001000
10hume pipe132835.636862.8
11Rolling Earth & moorum109017.1918737.1
12Transportanion of hard Muram246596.6238119
13Transportation Of Material190156.9829826.2
14Transportation of Water11500015000
15रेत15.2120018240
Total Material 709000