State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: DEHRA
Work Code: 1702001019/RS/36142 (Maryada abhiyan Masesh)
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 15/8/2012 Work start date : 19/6/2013
Present status : Existing Proposed Status : Individual Household Latrines
Tech Sanction Details
Technical Sanction No. : 156/19 Sanction Date : 27/9/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Maryada scheme2 scheme3 Total
2700 1800 0 0 5500 0 0 7300 0 10000
Financial Sanction Details
Financial\Administrative Sanction No: 47/19 Financial\Administrative Sanction Date 27/1/2013
Fin. Sanc. Amt. (in Rs) NREGA:4500 Maryada
5500
Scheme 2
0
Scheme 3
0
Total
10000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling foundation and around masonry work with moorum I/c ramming layers and watering.0.5121.560.75
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)0.321620.8518.656
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)0.321620.4518.528
4Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)0.762287.81738.728
5Half brick masonry in class 25 open bhatta or pajawa burnt brick in super structure including placing of 6mm iron bar at every 3rd layer of brick.-In cement mortar 1:46.5312.82033.2
6Honey comb brick masonry with class 25 open bhatta or pajawa burnt brick 10cm Thick.-In cement mortar 1:47.6172.91314.04
7Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height18.6556.71057.455
8Labour only for 10mm thick cement plaster of any ratio.1.54319.9492.646
915mm thick cement plaster on rough side of wall in-Cement mortar 1:4 (1cement, 4sand)4.3680.8352.288
10Providing and fixing cut stone slab (chisel dressed) for roofs including flush pointing of the bottom in C.M. 1:3 (1cement, 3sand) and filling the joints in C.M. 1:4 (1cement, 4sand) including fixing in chased grooves in walls, curing etc. complete.0.117736.6851.026
11Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-40 mm thick.1.45148214.6
12White washing whith lime on undecorated wall surfaces (two coats) to give an even shade including thoroughly broomed the surface to remove all dirt, dust, mortar drops and other foreign matter.11.655.462.91
13Providing and fixing water closet squatting pan (Indian type W.G. pan) size 580mm (earth work bed concrete, foot rests and trap to be measured and paid for separately)-Vitreous China Orissa pattern - white colour1292292
14Providing and fixing on Wall face Asbestos Cement building pipe of the following nominal size including jointing with sun yarn soaked in bitumen and cement mortar 1:2 (1cement, 2sand) complete .-80 mm dia.371.8215.4
15Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil3.6473.8268.632
16Earth work in excavation in Ordinary soil in foundation including all leads and lifts including rough dressing and breaking clods deposited the excavated materials away from work site.000
Total Activity 10000
S.NoMaterialQuantityUnit PriceTotal
1Bricks3002600
2Cement43001200
3complete material cost for NBA155005500
Total Material 7300