S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 100 | 25.31 | 2531 |
2 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 141.3 | 643.99 | 90995.787 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 65.2 | 128.79 | 8397.108 |
4 | Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing. | 3908.6 | 9.73 | 38030.678 |
5 | False work for R.C.C. and P.C.C. work in plinth and foundation | 195 | 167.5 | 32662.5 |
6 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 408 | 66.4 | 27091.2 |
7 | Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting) | 22.67 | 74.1 | 1679.847 |
8 | Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting. | 22.67 | 98.1 | 2223.927 |
9 | Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring chiselling (where blasting is prohibited) | 227 | 353.9 | 80335.3 |
10 | work charge | 1 | 20000 | 20000 |