State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: POLAYKHURDA
Work Code: 1719006071/RS/22012035119004 (nali nirman kary narayan prshad ke bade se ramchandra ke bade tak gp polaykhurd)
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 16/8/2023 Work start date : 8/10/2023
Present status : Not Exist Proposed Status : Constr of Open/Covered Grey Water Drain for Comm
Tech Sanction Details
Technical Sanction No. : 680 Sanction Date : 6/10/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost 15th Finance Commission scheme2 scheme3 Total
117823 0 0 0 450942 0 0 451000 0 568765
Financial Sanction Details
Financial\Administrative Sanction No: 71/03/23 Financial\Administrative Sanction Date 6/10/2023
Fin. Sanc. Amt. (in Rs) NREGA:117823 15th Finance Commission
450942
Scheme 2
0
Scheme 3
0
Total
569000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil84.6169.8514369.31
2Filling foundation and around masonry work with moorum I/c ramming layers and watering.14.1242.243415.584
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)52.174237.93221092.8081
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)14.13467.9948898.659
5False work for R.C.C. and P.C.C. work in plinth and foundation507.6182.2892525.328
6Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars2047.6790.38185068.4146
7Transportation of metal 14.1155.132187.333
8Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.714.185.691208.229
Total Activity 569000
S.NoMaterialQuantityUnit PriceTotal
1Contengency100
2Convergence Amount1450942450942
Total Material 451000