S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 8000 | 0.89 | 7120 |
2 | Work charge | 1 | 20556 | 20556 |
3 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 3480 | 42.52 | 147969.6 |
4 | Dag-beling-Single spade stroke minimum 75mm deep | 2000 | 0.13 | 260 |
5 | Collection of approved soil having CBR not less then 12, including stacking at quarry. | 540 | 56.96 | 30758.4 |
6 | Stacking without boxing.-Puddle earth, moorum, sand or kankar | 540 | 5.7 | 3078 |
7 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 540 | 171.5 | 92610 |
8 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 540 | 22.44 | 12117.6 |
9 | Rolling and consolidating water bound mecadam coat with any size of metal of any thickness upto 100mm thickness(including rolling screening or binding materials) including watering & filling in depressions which occur during the process with power roller-Including hire and running expenses of roller | 3200 | 8.1 | 25920 |
10 | Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia. | 7.5 | 3214.72 | 24110.4 |