S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 36.45 | 882 | 32148.9 |
2 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 18.22 | 3307.4 | 60260.828 |
3 | False work for R.C.C. and P.C.C. work in plinth and foundation | 36 | 147.8 | 5320.8 |
4 | Coursed rubble masonry second sort in plinth and foundation.-In Cement mortar 1:6 (1cement, 6sand) | 97.2 | 2082.1 | 202380.12 |
5 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Raised and cut pointing | 216 | 127.6 | 27561.6 |
6 | Transportation of metal | 27.7 | 183.7 | 5088.49 |
7 | Transportation of metal | 15.48 | 288.7 | 4469.076 |
8 | Transportation of sand | 42.42 | 377.7 | 16022.034 |
9 | Transportation rates for Masonry stone. | 97.2 | 257.18 | 24997.896 |
10 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 6 | 177.9 | 1067.4 |
11 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 8.14 | 291.3 | 2371.182 |
12 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 194.4 | 52.7 | 10244.88 |
13 | contingency | 1 | 966.794 | 966.794 |