State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: SURPURA
Work Code: 1702001069/LD/22012034301743 (Shanti Dham- Hospital ke peeche Surpura)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/1/1900 Work start date : 1/1/1900
Present status : NEW Proposed Status : Crematorium
Tech Sanction Details
Technical Sanction No. : 588 TS Sanction Date : 17/1/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
20000 226000 0 0 0 0 0 226000 0 246000
Financial Sanction Details
Financial\Administrative Sanction No: 07/588 Financial\Administrative Sanction Date 26/1/2017
Fin. Sanc. Amt. (in Rs) NREGA:246000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
246000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil19.73127.72519.521
3Filling foundation and around masonry work with moorum I/c ramming layers and watering.21.67247.95371.993
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.622562.84151.736
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)4.1491620155.6
6Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:8 (1cement, 8sand)3.952984.511788.775
7Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height1687.6671.7121005.222
810mm thick cement plaster on fair side of wall in-Cement mortar 1:5 (1cement, 5sand)15.396.21471.86
9Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.80 mm thick sheet.75.2800.360182.56
10Providing ridges or hips 600mm over all in plain G.I. sheet class III fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter G.I. limpet bitumen washers complete.-0.80 mm thick sheet.6.4528.93384.96
11Cement washing (Portland cement) 3 coats.-White cement13.524.9336.15
12Painting two coats (excluding priming coat) on new steel and other metal surfaces with Aluminium paint, brushing to give an even shade including cleaning the surface of all dirt, dust and other foreign matter.-2 coats150005000
13contingency180008000
Total Activity 246000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL5.210005200
2AngleRod7506548750
3Brick7300429200
4CEMENT(BEGS)5026013000
5Centering and Shuttering18.21302366
6Compaction of Earth Work145020.730015
7contengency150005000
8Rolling Compaction123.7559.77387.875
9Sand6.128004896
10sariya4005020000
11singboard120002000
12steel work2506015000
13Tean Shad2546516510
14Transpotation Charges 212600026000
Total Material 226000