S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 360 | 7.60930555555556 | 2739.35 |
2 | Mud Mortar | 94.878 | 439.144691076962 | 41665.17 |
3 | Dense or hard soil | 1800 | 10.6759555555556 | 19216.72 |
4 | (III) Lead upto 200 meters | 225.9 | 126.363390880921 | 28545.49 |
5 | (b) C.C. 1:3:6 (1cement, 3sand, 6metal) | 12.825 | 3642.9910331384 | 46721.36 |
6 | Filling foundation or under floor with 40mm gauge graded metal and moorum including
ramming in layers and watering. | 21.6 | 1444.41157407407 | 31199.29 |
7 | Labour only for random/ uncoursed rubble masonry in any. Mortar for item no.0506 excluding labour for preparation of mortar. | 225.9 | 996.14378043382 | 225028.88 |
8 | Extra rate for C.R./ R.R./ U.C.R. stone masonry in super structure above plinth level upto floor two level. | 97.2 | 323.65329218107 | 31459.1 |
9 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 150 | 107.319066666667 | 16097.86 |
10 | (a) Flush pointing | 540 | 121.432314814815 | 65573.45 |
11 | Collection of rubble masonry (size 0.014cum to 0.06cum) other then black trap, basalt or granite. | 225.9 | 760.410889774236 | 171776.82 |
12 | (c) Masonry stones, pitching stones or boulders | 225.9 | 50.5703408587871 | 11423.84 |
13 | (a) Dense or hard soil | 270 | 167.319111111111 | 45176.16 |
14 | (b) Dense or hard soil | 129.6 | 169.853086419753 | 22012.96 |