Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 07:01:38 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: JAMLI RAJGARH
Work Code: 1725007038/WC/22012034392866 (पोखर तालाब निर्माण कार्य )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2018 Work start date : 12/6/2018
Present status : Non-existent Proposed Status : Construction of Mini Percolation Tank for Comm
Tech Sanction Details
Technical Sanction No. : 70dt Sanction Date : 1/5/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
783000 250000 0 0 0 0 0 250000 0 1033000
Financial Sanction Details
Financial\Administrative Sanction No: 5da Financial\Administrative Sanction Date 1/6/2018
Fin. Sanc. Amt. (in Rs) NREGA:1033000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1033000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil7759.12510.783022.6375
222cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014130.5260.433982.2
3Surface dressing two coats with paving bitumen using 18kg. of bitumen 80/100 per 10sqm with 0.15cum of stone chipping 13.2mm nominal size per 10sqm for 1st coat and 11kg. of bitumen 80/100 per 10sqm with 0.10cum of stone chipping 11.2mm nominal size per 162645162645
4Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.16192.5950809629.5
5Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Hard moorum16192.592.743719.993
Total Activity 1033000
S.NoMaterialQuantityUnit PriceTotal
1Transportation charges505000250000
Total Material 250000