State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: NONKISARAI(P)
Work Code: 1703004039/RC/22012034319468 (C.C.ROAD NIRMAN SHEKHUPUR ADIWASHI DAFAI)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 3/10/2016 Work start date : 27/12/2016
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 039/4387 Sanction Date : 19/12/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
88733 59155 0 0 373274 0 0 433000 0 521162
Financial Sanction Details
Financial\Administrative Sanction No: 039/01 Financial\Administrative Sanction Date 21/12/2016
Fin. Sanc. Amt. (in Rs) NREGA:147888 Panchparmeshwar
373274
Scheme 2
0
Scheme 3
0
Total
522000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep3360.3100.8
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)117.63307.4388950.24
3False work for R.C.C. and P.C.C. work in plinth and foundation67.2147.89932.16
4Transportation of 20 MM metal99.96362.136195.516
5Transportation of sand50.57320.1316188.9741
6Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.98.28196.8319344.4524
7Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.25.87203.135254.9731
8Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.98.2844.74393.116
9Excavating post holes (or similar holes) upto 0.5cum including getting out the excavated soil, than returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc., disposing of-Dense or hard soil.000
10Collection of hard moorum including stacking at quarry.98.28142.514004.9
11Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.655.2149172.8
12contingency117623.8217623.82
Total Activity 522000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL99.961262.1126159.516
2CEMENT(BEGS)737278204886
3Centring & Shuttering67.251.73474.24
4contangency and work charges141764.2941764.29
5PhotoCopy & Stationary19797
6SAND50.57920.1346530.9741
7Transportanion of hard Muram98.2896.849517.4352
Total Material 433000