S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Dag-beling-Single spade stroke minimum 75mm deep | 336 | 0.3 | 100.8 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 117.6 | 3307.4 | 388950.24 |
3 | False work for R.C.C. and P.C.C. work in plinth and foundation | 67.2 | 147.8 | 9932.16 |
4 | Transportation of 20 MM metal | 99.96 | 362.1 | 36195.516 |
5 | Transportation of sand | 50.57 | 320.13 | 16188.9741 |
6 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 98.28 | 196.83 | 19344.4524 |
7 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 25.87 | 203.13 | 5254.9731 |
8 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 98.28 | 44.7 | 4393.116 |
9 | Excavating post holes (or similar holes) upto 0.5cum including getting out the excavated soil, than returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc., disposing of-Dense or hard soil. | 0 | 0 | 0 |
10 | Collection of hard moorum including stacking at quarry. | 98.28 | 142.5 | 14004.9 |
11 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil. | 655.2 | 14 | 9172.8 |
12 | contingency | 1 | 17623.82 | 17623.82 |