Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 07:22:00 PM 
Back  
State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: BAROKHAR
Work Code: 1713004020/DP/22012034442259 (पेय कूप निर्माण दर्जियान टोला me)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2019 Work start date : 12/2/2019
Present status : Not Exist Proposed Status : Construction of Irrigation Open Well for Community
Tech Sanction Details
Technical Sanction No. : 146692/08 Sanction Date : 27/1/2019
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
307000 228000 0 0 0 0 0 228000 0 535000
Financial Sanction Details
Financial\Administrative Sanction No: 09/20/2018/ Financial\Administrative Sanction Date 28/1/2019
Fin. Sanc. Amt. (in Rs) NREGA:535000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
535000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard100
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)43235.412941.6
3Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)35.214253149748.13
4Brick bat filling in trenches or soak pits.6.75325.62197.8
5Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height4400016000
6Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-40 mm thick.31.32164551521.4
7Earth work for well excavation-Lift from 1.5 m. to 2.00 m.75.3618614016.96
8Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)25.1252313137.76
9Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 12.50 m. to 13.00 m.76.75745679.5
10Earth work for well excavation-Hard rock requiring blasting lift from 3.00 m. to 3.50m.65.08588.738312.596
11Earth work for well excavation-Hard rock requiring blasting lift from 5.50 m. to 6.00 m.65.23676.344115.049
12Earth work for well excavation-Hard rock requiring blasting lift from 3.50 m. to 4.00 m.19.23698.213426.386
13Earth work for well excavation- Hard rock requiring blasting lift from 4.00 m. to 4.50 m.22.08676.614939.328
14Earth work for well excavation-Hard rock requiring blasting lift from 4.50 m. to 5.00 m.22.08682.515069.6
15Earth work for well excavation-Hard rock requiring blasting lift from 5.00 m. to 5.50 m.19.23654.412584.112
16Earth work for well excavation-Hard rock requiring blasting lift from 6.00 m. to 6.50 m.11.876998297.13
17Earth work for well excavation-Hard rock requiring blasting lift from 6.50 m. to 7.00 m.11.87725.78614.059
18Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)11.56035.3569406.525
19Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work55145.88019
20Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Loose or soft soil for Tank Work65.12566.836910.016
Total Activity 535000
S.NoMaterialQuantityUnit PriceTotal
1100 mm pipe120002000
220 M.M. METAL25.27155039168.5
3Binding wire90867740
4Blasting510005000
5Bricks6000530000
6cement Begs19028053200
7Centering and Shuttering231.738018538.4
8Display board115001500
9SAND35.08125043850
10STEEL40052.521000
11Transporation of Boulder140004000
12Transpotation Charges120002000
Total Material 228000