S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 96.6 | 882 | 85201.2 |
2 | Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing. | 621 | 211.4 | 131279.4 |
3 | False work for R.C.C. and P.C.C. work in plinth and foundation | 92 | 147.8 | 13597.6 |
4 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Lime mortar 1:2 (1lime putty, 2sand) | 310.5 | 1858.7 | 577126.35 |
5 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Raised and cut pointing | 828 | 127.6 | 105652.8 |
6 | Transportation of metal | 64.7 | 323.7 | 20943.39 |
7 | Transportation of metal | 26.39 | 448.7 | 11841.193 |
8 | Transportation of sand | 145.66 | 348.93 | 50825.1438 |
9 | Transportation rates for Masonry stone. | 310.5 | 306.18 | 95068.89 |
10 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 31.87 | 123.03 | 3920.9661 |
11 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 22.95 | 259.83 | 5963.0985 |
12 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 579.6 | 96.2 | 55757.52 |
13 | contingency | 1 | 12.44 | 12.44 |