State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: ITMA(P)
Work Code: 1703004005/WC/235 (kup nirmaan bhagvanlal son chinturam etma )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 1/4/2011 Work start date : 1/4/2011
Present status : Existing Proposed Status : Check Dam
Tech Sanction Details
Technical Sanction No. : 005/123 Sanction Date : 12/9/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
100907 92980 0 0 0 0 0 93000 0 193887
Financial Sanction Details
Financial\Administrative Sanction No: 24/1 Financial\Administrative Sanction Date 15/10/2011
Fin. Sanc. Amt. (in Rs) NREGA:193887 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
194000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)4.552266.610313.03
2False work for R.C.C. and P.C.C. work in plinth and foundation9.16116.41066.224
3Coursed rubble masonry second sort in plinth and foundation.-In Cement mortar 1:6 (1cement, 6sand)61.21534.593911.4
4Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:3 (1cement, 3sand)-Flush pointing109.8990.99989.001
5Transportation rates for Masonry stone.61.2228.0413956.048
6Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil45.3875.33417.114
7Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)14.132723843.36
8Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.4.81393.11890.811
9Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m84.78133.9411355.4332
10Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m42.39290.4412311.7516
11Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 6.0 m initial depth upto 10.5 m9.62409.313937.5622
12Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 10.5 m initial depth upto 18.0 m000
131902 Transportion of metal3.86267.91034.094
14transportion of sand28.06162.814568.4486
15contingency12088720887
16TRANSPOTATION OF CEMENT5.25136.71717.7275
Total Activity 194000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL3.869003474
2Cement10026826800
3SAND (RATE)28.0655015433
4signboard135003500
5Stone other than Granite61.239524174
6Stone transport61.2228.0413956.048
7Transportation of metal3.86267.91034.094
8Transportation of Sand28.06162.814568.4486
Total Material 93000