Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 12:37:05 AM 
Back  
State: MADHYA PRADESH District: DHAR Block: NALCHHA Panchayat: Silotiya
Work Code: 1722005027/RC/22012034201174 (sri ram mandir se magilal kanayalala ke ghartha)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 27/9/2013 Work start date : 3/10/2013
Present status : Bitumen Top Proposed Status : Bitumen Top
Tech Sanction Details
Technical Sanction No. : 506(2013) Sanction Date : 27/9/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost MMGSY scheme2 scheme3 Total
28000 18000 0 0 50000 0 0 68000 0 96000
Financial Sanction Details
Financial\Administrative Sanction No: 1593(13-14) Financial\Administrative Sanction Date 4/10/2013
Fin. Sanc. Amt. (in Rs) NREGA:46000 MMGSY
50000
Scheme 2
0
Scheme 3
0
Total
96000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Dag-beling-Single spade stroke minimum 75mm deep80.40.540.2
3Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead40.6887.63563.568
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)13.42833.237964.88
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)11.79219025820.1
6False work for R.C.C. and P.C.C. work in plinth and foundation77.35127.19831.185
7Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)46.96.2290.78
8Transportation of metal 23.37146.73428.379
9Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.23.3741958.17
10Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN16.457.8947.92
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.40.6881.23303.216
12Collection of hard moorum including stacking at quarry.23.37130.83056.796
13contingency142004200
Total Activity 96000
S.NoMaterialQuantityUnit PriceTotal
1Cement22030066000
2SIGNBOARD NO120002000
Total Material 68000