S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 6864 | 4.73760052447552 | 32518.89 |
2 | Road Work (3.2) Earth work in filling (near the road berm by digging pits ) laying 25cm. Layer, compaction (with Durmut) dressing, to give level and camber including disposal of earth excavated. (i) 1.5meter vertical lift and 15meter horizontal lead. (b) D.B.D more than 1.6. | 781.583 | 169.389751312401 | 132392.15 |