S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 6400 | 1.6 | 10240 |
2 | Work charge | 500 | 146 | 73000 |
3 | Dag-beling-Single spade stroke minimum 75mm deep | 3000 | 0.2 | 600 |
4 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 5833 | 4.8 | 27998.4 |
5 | Transportation of metal | 3211.025 | 102.69 | 329740.15725 |
6 | Transportation of metal | 463.5 | 223.56 | 103620.06 |
7 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor | 3398.45 | 23 | 78164.35 |
8 | Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7) | 118.45 | 39.6 | 4690.62 |
9 | Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP: | 154.5 | 578.3 | 89347.35 |
10 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 919.275 | 81.2 | 74645.13 |
11 | Collection of puddle earth including stacking at quarry | 2629.07 | 112.8 | 296559.096 |
12 | Collection of hard moorum including stacking at quarry. | 463.5 | 130.8 | 60625.8 |
13 | SIGN BOARD | 1 | 1500 | 1500 |
14 | contingency | 1 | 40326 | 40326 |
15 | Labour difference in case of old SoR | 1 | 14 | 14 |