S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 24.3 | 42.7901234567901 | 1039.8 |
2 | Transportation of metal -
(j) 5.0 Km. Lead cum 171.7 | 36.45 | 145.979972565158 | 5320.97 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.
Dense or hard soil for Tank Work | 13.5 | 96.74 | 1305.99 |
4 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.
Hard moorum for Tank Work | 13.5 | 128.76 | 1738.26 |
5 | Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5
Grading-2 (Size ranging from 63 mm to 45 mm) | 1.35 | 448.051851851852 | 604.87 |
6 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 13.5 | 120.08 | 1621.08 |
7 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 13.5 | 166.67037037037 | 2250.05 |