State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: DEHRA
Work Code: 1702001019/WC/22012034424776 (Naveen Talab Nirman- Dehra)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2018 Work start date : 29/9/2018
Present status : Non-existent Proposed Status : Constr of Water Absorption Trench Trench for Comm
Tech Sanction Details
Technical Sanction No. : 3557 TS Sanction Date : 28/9/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
690000 460000 0 0 0 0 0 460000 0 1150000
Financial Sanction Details
Financial\Administrative Sanction No: 12/3557 Financial\Administrative Sanction Date 29/9/2018
Fin. Sanc. Amt. (in Rs) NREGA:1150000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1150000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises7000321000
2Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil276.7752.714585.779
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)113.6192562.5291148.6875
422cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.01429416548510
5Transportation of metal 151.2183.1627693.792
6Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making3570.32172.46615737.3872
7FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc.245.52474116376.48
8FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders25.2574.614479.92
Total Activity 1150000
S.NoMaterialQuantityUnit PriceTotal
140 mm size HG metal35.4470024808
2boldar12985029850
3Brick3000515000
4Cement11030033000
5Display board125002500
6Khanta14550045500
7Loosening Machine Rent187508750
8pitching stone12654126541
9Rolling Compaction12251422514
10Soil Transportation9070063000
11t.p.g. E/W puddle earth by tre12900029000
12Transportanion of hard Muram141504150
13Transpotation Charges14800048000
14गिटटी 20 एम एम50.0190045009
15मुरम12580025800
16रेत13650036500
Total Material 460000