S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 7000 | 3 | 21000 |
2 | Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil | 276.77 | 52.7 | 14585.779 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 113.619 | 2562.5 | 291148.6875 |
4 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 294 | 165 | 48510 |
5 | Transportation of metal | 151.2 | 183.16 | 27693.792 |
6 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 3570.32 | 172.46 | 615737.3872 |
7 | FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc. | 245.52 | 474 | 116376.48 |
8 | FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders | 25.2 | 574.6 | 14479.92 |