S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Labour only for item no.0402 | 100 | 39 | 3900 |
2 | Labour only for item no. 0408 (for any proportion of lime mortar used) | 25 | 800 | 20000 |
3 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size) | 691.2 | 52.3 | 36149.76 |
4 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size) | 19.07 | 4253 | 81104.71 |
5 | Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee. | 90 | 65 | 5850 |
6 | Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting) | 15 | 4200 | 63000 |
7 | Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works) | 90000 | 0.3 | 27000 |
8 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 7500 | 10 | 75000 |
9 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 250 | 800 | 200000 |
10 | work charge | 22 | 1000 | 22000 |