State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: BHENGNA(P)
Work Code: 1703004060/IF/22012034427353 (nadep nirman kary mahesh/shyamlal)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 7/5/2018 Work start date : 2/8/2018
Present status : Not Exist Proposed Status : Constr of NADEP Compost structure for Individual
Tech Sanction Details
Technical Sanction No. : 60/510 Sanction Date : 7/5/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
10203 6797 0 0 0 0 0 6800 0 17000
Financial Sanction Details
Financial\Administrative Sanction No: 60/.65 Financial\Administrative Sanction Date 5/7/2018
Fin. Sanc. Amt. (in Rs) NREGA:17000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
17000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Deduct from items 0102 for uprooting not done.110001000
2Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil2.2496.2215.488
3Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.1.88821587.6
4Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing.0.4053307.41339.497
5Deduct for concrete unvibrated in item no. 04251.8147.8266.04
6Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.5.69710796147.063
7Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Flush pointing21.668.21473.12
8Transportation of sand10.36330.723426.2592
9contingency13111.541450.02
Total Activity 17000
S.NoMaterialQuantityUnit PriceTotal
1Cement2310620
2Convergence Amount13111.541450.02
3Display board110001000
4GITTI1660.445660.445
5Mooram2.71123.3334.143
6Sand0.22880193.6
7Transpotation Charges5.6453.182537.808
Total Material 6800