S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 264 | 7 | 1848 |
2 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting) | 105 | 191 | 20055 |
3 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 120 | 277 | 33240 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 0 | 3947 | 0 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 0 | 3202 | 0 |
6 | False work for R.C.C. and P.C.C. work in plinth and foundation | 2000 | 1 | 2000 |
7 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars | 1 | 3645 | 3645 |
8 | Transportation of metal | 91200 | 1 | 91200 |
9 | Transportation of metal | 0 | 293.59 | 0 |
10 | Transportation of sand | 0 | 213.9 | 0 |
11 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 0 | 155.38 | 0 |