State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: KERBANA
Work Code: 1711003040/WC/9993658513 (GABION STRUCTURE DUDHARA NALA PAR GRAM KERBANA)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2015 Work start date : 19/10/2015
Present status : Non-existent Proposed Status : Gabions
Tech Sanction Details
Technical Sanction No. : 190/ker Sanction Date : 13/10/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
392000 208000 0 0 0 0 0 208000 0 600000
Financial Sanction Details
Financial\Administrative Sanction No: 17/ker Financial\Administrative Sanction Date 14/10/2015
Fin. Sanc. Amt. (in Rs) NREGA:600000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
600000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Contingency11166511665
3Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee.128780102960
4TRANSPORTATION OF MATERIAL18452984529
5FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc.57285.816290.6
6FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders706.8382.8270563.04
7Site clearance, cutting grass, raking into heaps and removing off the premises4801.8864
8Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work38488.433945.6
9Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.706.8109.277182.56
Total Activity 600000
S.NoMaterialQuantityUnit PriceTotal
1Binding wire128780102960
2Bolder574.09176.87101539.2983
3Display board120002000
4PhotoCopy & Stationary110001000
5Photographs1500500
Total Material 208000