State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: TEHRA
Work Code: 1713004025/RC/22012034289778 (Ts No. 1260 खेत सडक निर्माण काटन से उदई तालाब की ओर )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 6/10/2015 Work start date : 22/11/2015
Present status : No Road Proposed Status : Mitti Murram Road
Tech Sanction Details
Technical Sanction No. : 1260/05/25 Sanction Date : 11/11/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
611000 500000 0 0 0 0 0 500000 0 1111000
Financial Sanction Details
Financial\Administrative Sanction No: 15/05/25 Financial\Administrative Sanction Date 21/11/2015
Fin. Sanc. Amt. (in Rs) NREGA:1111000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1111000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard015000
2Work charge15800058000
3Dag-beling-Single spade stroke minimum 75mm deep72000.21440
4Transportation of metal 1800114.1205380
5Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making360021.577400
6Site clearance, cutting grass, raking into heaps and removing off the premises72001.611520
7Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.720060.2433440
8Collection of puddle earth including stacking at quarry1200112.8135360
91902 Transportion of metal900208.4187560
Total Activity 1111000
S.NoMaterialQuantityUnit PriceTotal
1contangency and work charges12300023000
2Hume pipe-NP210540054000
3Rolling of Muram180021.1137998
4Rolling of Soil180021.1137998
5Soil transport360021.1175996
6Transportation of Muram560021.11118216
7Transportation of Water720021.11151992
Total Material 500000