S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Contingency | 24.46 | 1000 | 24460 |
3 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 50 | 70.6 | 3530 |
4 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 2350 | 21.9 | 51465 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 15 | 3089.9 | 46348.5 |
6 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 10.5 | 2404.1 | 25243.05 |
7 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand) | 25 | 2005 | 50125 |
8 | TRANSPORTATION OF MATERIAL | 83 | 1000 | 83000 |
9 | Pointing on random rubble masonry or uncoursed stone masonry with lime surkhi mortar 1:2 (1lime putty, 2surhki)-Raised and cut pointing | 25.4 | 147.6 | 3749.04 |
10 | 22cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth. | 135 | 136.1 | 18373.5 |
11 | Add extra item no. 1274 for quarried boulder pitching. | 135 | 107.3 | 14485.5 |
12 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 444.51875 | 3.2 | 1422.46 |
13 | Transportation of sand | 8 | 1000 | 8000 |
14 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 275 | 3.2 | 880 |
15 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 165 | 41 | 6765 |
16 | FOR EARTHEN DAM - Puddle filling of good clay (excluding cost of puddle earth and water) including mixing kneeding by tamping, ramming and laying etc. | 275 | 151.9 | 41772.5 |
17 | FOR EARTHEN DAM - Deduct from item 2305 in case water supplied departmentally. | 182.25 | 96.2 | 17532.45 |
18 | Site clearance, cutting grass, raking into heaps and removing off the premises | 3050 | 1.6 | 4880 |
19 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 4250 | 81.2 | 345100 |
20 | Collection of puddle earth including stacking at quarry | 275 | 112.8 | 31020 |
21 | Collection of hard moorum including stacking at quarry. | 60 | 130.8 | 7848 |