Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 10:23:27 AM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: BADGAON PIPLOD
Work Code: 1725007005/IC/22012034882918 (payjal kup nirman kary shreekrasn narayan ke khet pass kedarkhedi)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2023 Work start date : 19/6/2023
Present status : Not Exist Proposed Status : Construction of Irrigation Open Well for Groups
Tech Sanction Details
Technical Sanction No. : 1725007/2023-2024/92162/TS Sanction Date : 20/6/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
220917.88 122475.93 128327.33 898.5 0 0 0 252000 0 472619.64
Financial Sanction Details
Financial\Administrative Sanction No: 1725007/2023-2024/92162/AS Financial\Administrative Sanction Date 24/6/2023
Fin. Sanc. Amt. (in Rs) NREGA:472620 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
473000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m57.0867.00735809390333824.78
2(b) C.C. 1:3:6 (1cement, 3sand, 6metal)3.2973467.9890809827111433.96
3Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15) (a) C.C. 1:2:4 (1cement, 2sand, 4metal)1.954408.246153846158596.08
4(c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size)10.2245689.6547339593158171.03
5(b) Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars291.01690.384446216015626303.32
6(XVII) 14 Km. Lead5.966307.081796848811832.05
7(X) 5.0 Km. Lead9215.3566666666671938.21
8(X) 5.0 Km. Lead9168.541516.86
9(XVII) 14 Km. Lead2.316276.373056994819640.08
10(XXXI) 70 Km. Lead5.338761.2214312476584063.4
11(XVII) 14 Km. Lead0.35276.37142857142996.73
12(b) Dense or hard soil89.34173.06290575330215461.44
13(I)1.50 m. to 2.00 m.29.78234.5030221625256983.5
14(II)2.00 m. to 2.50 m.29.78246.2159167226337332.31
15(XXVI)14.00 m. to 14.50 m.9.8751095.3043037974710816.13
16(III)2.50 m. to 3.00 m.29.78584.04298186702517392.8
17(X)6.00 m. to 6.50 m.11.949978.3203615365311689.95
18(XI)6.50 m. to 7.00 m.11.949999.44765252322411942.4
19(XII)7.00 m. to 7.50 m.11.9491020.5757804000312194.86
20(XIII)7.50 m. to 8.00 m.11.9491041.7030713867312447.31
21(XIV)8.00 m. to 8.50 m.11.9491062.8311992635412699.77
22(XV)8.50 m. to 9.00 m.11.9491083.9584902502312952.22
23(XVI)9.00 m. to 9.50 m.9.8751105.0855696202510912.72
24(XVII)9.50 m. to 10.00 m.9.8751126.2136708860811121.36
25(XVIII)10.00 m. to 10.50 m.9.8131147.3412819728911258.86
26(XIX)10.50 m. to 11.00 m.9.8131174.4359523081611524.74
27(XX)11.00 m. to 11.50 m.9.8131201.5306226434311790.62
28(XXI)11.50 m. to 12.00 m.9.8131228.625292978712056.5
29(XXII)12.00 m. to 12.50 m.9.8131255.7199633139712322.38
30(XXIII)12.50 m. to 13.00 m.9.8751282.8141772151912667.79
31(XXV)13.50 m. to 14.00 m.9.8751337.003544303813202.91
32(XXVII)14.50 m. to 15.00 m.9.8751391.1929113924113738.03
33(IV)3.00 m. to 3.50 m.25.28870.22943037974721999.4
34(V)3.50 m. to 4.00 m.25.28887.62183544303822439.08
35(VI)4.00 m. to 4.50 m.14.22905.01476793248912869.31
36(VII)4.50 m. to 5.00 m.13.75922.40727272727312683.1
37(VIII)5.00 m. to 5.50 m.11.949939.79998326219811229.67
38(IX)5.50 m. to 6.00 m.11.949957.19307054983711437.5
39Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.9187.2977777777781685.68
40Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.9261.2177777777782350.96
Total Activity 468000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper1.547110001547.1
20084-Hire charges of Diesel truck - 9 tonne (without POL)1.7778777221003733.543212
30297-Stone Aggregate(single size): 10 mm nominal size2.463786501601.457
40325-Blasting powder174.984804569799.149024
50326-Blasting fuse (fuse wire)190.7934285342.2152
60367-Portland Cement4.64052640029699.328
70983-Fine sand (zone IV)7.0278910257203.58725
81005-Twisted steel/deformed bars3.055668690021084.1092
91235-Diesel oil33.752353111003375.235311
103-Display Board / CIB150005000
115001-Mobil oil1.20407005270325.0989135
127335-Binding wire2.9101660174.6096
13MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT2.143055001071.525
14MR6007-Hier Charges for Centering10.2246786931.872
15MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)9.084367907176.6444
Total Material 105000