S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 2000 | 1.5 | 3000 |
2 | Contingency | 1 | 2000 | 2000 |
3 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 11.88 | 73.4 | 871.992 |
4 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 2000 | 0.4 | 800 |
5 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 1 | 1500 | 1500 |
6 | Transportation of metal | 580 | 81.27 | 47136.6 |
7 | Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN | 580 | 80.1 | 46458 |
8 | FOR EARTHEN DAM - Benching the seat of embankment over to an average depth of 15cm and cross slope of 1:12 including earth work removing the rubbish upto a distance of 50m including dressing. | 117.59 | 81 | 9524.79 |
9 | Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Dense or hard soil | 112.19 | 81 | 9087.39 |
10 | Collection of hard moorum including stacking at quarry. | 580 | 118.3 | 68614 |