State: MADHYA PRADESH District: MANDSAUR Block: BHANPURA Panchayat: PARONYA
Work Code: 1716001028/LD/3799395183 (Khel Medan Proniya)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 1/9/2012 Work start date : 12/6/2013
Present status : Not Exist Proposed Status : Development of Waste Land
Tech Sanction Details
Technical Sanction No. : 211/1 Sanction Date : 3/9/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
92000 97000 0 0 0 0 0 97000 0 189000
Financial Sanction Details
Financial\Administrative Sanction No: 04/4 Financial\Administrative Sanction Date 15/9/2012
Fin. Sanc. Amt. (in Rs) NREGA:189000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
189000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises20001.53000
2Contingency120002000
3Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil11.8873.4871.992
4Dag-beling-Double spade "v" shaped stroke 100mm deep20000.4800
5Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars115001500
6Transportation of metal 58081.2747136.6
7Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN58080.146458
8FOR EARTHEN DAM - Benching the seat of embankment over to an average depth of 15cm and cross slope of 1:12 including earth work removing the rubbish upto a distance of 50m including dressing.117.59819524.79
9Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Dense or hard soil112.19819087.39
10Collection of hard moorum including stacking at quarry.580118.368614
Total Activity 189000
S.NoMaterialQuantityUnit PriceTotal
1Board125002500
2Moorum58081.247096
3Photograph650300
4Rolling58081.147038
5मिटटी परिवहन000
Total Material 97000