State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: NAHAR MAL
Work Code: 1725007049/RC/22012034205682 (सुदूर ग्राम संपर्क एवं खेत सडक योजनान्‍तर्गत ग्रेवल सडक निर्माण रामरतन के खेत से तीरा बलीराम के खेत )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/1/2014 Work start date : 15/1/2014
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 1750xxx Sanction Date : 27/1/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
782000 709000 0 0 0 0 0 709000 0 1491000
Financial Sanction Details
Financial\Administrative Sanction No: 31xxx Financial\Administrative Sanction Date 8/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:1491000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1491000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises1147.51.61836
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.51004.120910
3Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Dense or hard soil109081.288508
4Dag-beling-Double spade "v" shaped stroke 100mm deep25500.51275
5Filling foundation and around masonry work with moorum I/c ramming layers and watering.3.35145.4487.09
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)2.73296.48900.28
7Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)32.62478.280789.32
8False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift70.04199.713986.988
9Transportation of metal 127.4313.9639998.504
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.2465120.69297500.85
11Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7246523.658174
12Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.13.53189.4543057.575
13Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making109019.120819
14Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact246523.758420.5
15Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau382.5721.7276050.25
16Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:159.375349.155637.8125
17Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work180.62589.616184
18Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Well Work15.5888.31375.714
19Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Dense or hard soil (PT/30/30)6.75105708.75
20Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)2465118.8292842
21work charge1130100113000
Total Activity 1491000
S.NoMaterialQuantityUnit PriceTotal
120mm Chips511005500
240 mm Metal105081.0185060.5
3Cement435300130500
4Centering and Shuttering155007500
5Compaction406519.177641.5
6Dieasel Pump1200200
7Display board110001000
8Drinking Water Facilities6050030000
9Mixer Machine10001515000
10PhotoCopy & Stationary1502300
11pipe330013.544550
12Soil transport80000
13Transportanion of hard Muram2465118.8292842
14transportion by trectour4740018800
15सम्‍पूर्ण सामाग्री क्रर्य532106