The Mahatma Gandhi National Rural Employment Guarantee Act 28-Jun-2024 05:51:37 PM 
Back  
State: MADHYA PRADESH District: REWA Block: NAIGARHI Panchayat: BADHAWA BHAIBHAT
Work Code: 1713007024/IF/22012035198330 (कपिल धारा कूप निर्माण कार्य संतोष कुशवाहा )
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 20/9/2023 Work start date : 10/2/2024
Present status : Not Exist Proposed Status : Constr of Boulder Check Dam for Individuals
Tech Sanction Details
Technical Sanction No. : 1713007/2023-2024/18957/TS Sanction Date : 3/3/2024
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
124513.29 91711.43 67209.84 3051.58 0 0 0 162000 0 286486.14
Financial Sanction Details
Financial\Administrative Sanction No: 1713007/2023-2024/18957/AS Financial\Administrative Sanction Date 6/3/2024
Fin. Sanc. Amt. (in Rs) NREGA:286665 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
287000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m52.0967.00748704165873490.42
2(b) C.C. 1:3:6 (1cement, 3sand, 6metal)1.9973467.986980470716925.57
3Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15) (a) C.C. 1:2:4 (1cement, 2sand, 4metal)0.1634408.22085889571718.54
4(c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size)2.4935689.6550340954714184.31
5Centering and shuttering including strutting , propping etc. and removal of form work for P.C.C. work in foundation, footing, bases for column1.633182.284139620331297.67
6(j) Cement mortar 1:6 (1cement, 6sand)11.2674677.4580633709152700.92
7(b) Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars126.5890.384499920998611440.87
8(b) Cement mortar 1:4 (1cement, 4sand)24.492172.1545810877024216.41
9(j) 5.0 Km. Lead4.208192.884980988593811.66
10(X) 5.0 Km. Lead12.09187.2671629445822264.06
11(X) 5.0 Km. Lead9215.3566666666671938.21
12(X) 5.0 Km. Lead9168.541516.86
13(XV) 10 Km. Lead7.114238.3427045262861695.57
14(XV) 10 Km. Lead0.134238.35820895522431.94
15(b) Dense or hard soil60.235173.06283722088510424.44
16(I)1.50 m. to 2.00 m.20.078234.5029385396954708.35
17(II)2.00 m. to 2.50 m.20.078246.2157585416874943.52
18(XVIII)10.00 m. to 10.50 m.7.257878.5476092049066375.62
19(XIX)10.50 m. to 11.00 m.7.257905.6428276147176572.25
20(XX)11.00 m. to 11.50 m.6.924932.7368573079156458.27
21(XXI)11.50 m. to 12.00 m.6.924959.8310225303296645.87
22(III)2.50 m. to 3.00 m.20.078584.04273333997411726.41
23(X)6.00 m. to 6.50 m.8.67978.3206459054218482.04
24(XI)6.50 m. to 7.00 m.8.67999.4475201845448665.21
25(XII)7.00 m. to 7.50 m.8.3051020.575556893448475.88
26(XIII)7.50 m. to 8.00 m.8.3051041.703792895858651.35
27(XIV)8.00 m. to 8.50 m.7.9481062.830900855568447.38
28(XV)8.50 m. to 9.00 m.7.9481083.958228485158615.3
29(XVI)9.00 m. to 9.50 m.7.5991105.086195552058397.55
30(XVII)9.50 m. to 10.00 m.7.5991126.21397552318558.1
31(IV)3.00 m. to 3.50 m.9.813870.2292876796098539.56
32(V)3.50 m. to 4.00 m.9.813887.6215224701938710.23
33(VI)4.00 m. to 4.50 m.9.424905.0148556876068528.86
34(VII)4.50 m. to 5.00 m.9.424922.4076825127348692.77
35(VIII)5.00 m. to 5.50 m.9.043939.799845184128498.61
36(IX)5.50 m. to 6.00 m.9.043957.1923034391248655.89
37Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.9187.2977777777781685.68
38Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.9261.2177777777782350.96
39Citizen Information Board of size 0.6 meter x 0.9 meter ( Individual works )12622.392622.39
Total Activity 287000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.61715821000617.1582
20084-Hire charges of Diesel truck - 9 tonne (without POL)1.6579671321003481.730973
30297-Stone Aggregate(single size): 10 mm nominal size0.56639650368.1535
40325-Blasting powder78.069768564371.907008
50326-Blasting fuse (fuse wire)85.1228282383.4384
60367-Portland Cement2.09157212640013386.061568
70368-White cement 0.0002189156263.4205314
80983-Fine sand (zone IV)5.2499554810255381.204367
91005-Twisted steel/deformed bars1.3290969009170.721
101235-Diesel oil20.808051071002080.805107
115001-Mobil oil0.73720656270199.0457712
127335-Binding wire1.26586075.948
137900-Modular common burnt clay bricks of class designation 7.56009.645.231250.128
14MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT1.35005500675.025
15MR6007-Hier Charges for Centering2.4936781690.254
16MR6032-Snowcem/ durocem0.00041792600010.8654
17MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)2.289417901808.6339
18MR6091-WOOD-Kail wood 2nd class0.0058321418000104.97852
Total Material 77100