S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | (b) C.C. 1:3:6 (1cement, 3sand, 6metal) | 15.75 | 3202.63365079365 | 50441.48 |
2 | False work for R.C.C. and P.C.C. work in plinth and foundation. | 60 | 174.2075 | 10452.45 |
3 | (a) Headworks/Other Works | 1 | 1556.01 | 1556.01 |
4 | (b) Above 15 m interval | 1 | 778.01 | 778.01 |
5 | (a) Below 5 m interval | 1 | 2593.35 | 2593.35 |
6 | (d) Above 15 m interval | 1 | 829.87 | 829.87 |
7 | (a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work) | 6674.6 | 2.52450034458994 | 16850.03 |
8 | (X) 5.0 Km. Lead | 360 | 155.389 | 55940.04 |
9 | (VI) 3.0 Km. Lead | 3326.6 | 128.147132207058 | 426294.25 |
10 | (a) 900 mm dia. | 9 | 3199.37333333333 | 28794.36 |
11 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making 4% camber and required Grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 97% as per table 300.1 and 300.2 of (MORD) - i/c required leads and lifts of materials etc. complete. | 2988 | 17.4425435073628 | 52118.32 |
12 | Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7). Complete compaction work as per specifications for rural roads (MORD) clause 303, i/c required leads and lifts of materials etc. complete. | 2966.6 | 24.4833479404032 | 72632.3 |
13 | Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7), as per clause 407 of specifications for rural roads(MORD), i/c required leads and lifts of materials etc. complete. | 810 | 36.6301851851852 | 29670.45 |
14 | Site clearance, cutting grass, raking into heaps and removing off the premises | 9000 | 2.81891333333333 | 25370.22 |
15 | c (i) Hard moorum for Road Work | 1494 | 191.792637215529 | 286538.2 |
16 | Collection/Excavation of Graval Material meeting the requirements of Hard Moorum as detailed in RES SOR chaper 03 Notes Clause 3.2© including stacking and all leads and lifts up to loading point at quarry. | 360 | 223.604388888889 | 80497.58 |
17 | Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry. | 540 | 195.942 | 105808.68 |
18 | Stacking of Gravel or Hard Moorum at site without Boxing. | 1909.65 | 23.3286256643888 | 44549.51 |
19 | Spreading of material, mixing by mix in place method by manual means or by Tractor mount disk herrows to meet the requirements of Grading and Plasticity given in clause 2.2.2.2, 2.2.2.3, 2.2.3.1 and 2.2.3.2 of IRC:SP:77-2008. and grading by tractor mount grader to get the required profile. | 720 | 139.324 | 100313.28 |
20 | Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine. | 2966.6 | 3.60017865570013 | 10680.29 |
21 | Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed. | 1096.95 | 79.0971785404986 | 86765.65 |
22 | Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works ) | 0.95 | 3682 | 3497.9 |