State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: AITHAAR
Work Code: 1702001027/AV/22012034651885 (Samudayak Bhawan Nirman , Aithaar)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 15/8/2023 Work start date : 5/12/2023
Present status : NEW Proposed Status : Constr of Bharat Nirman Seva Kendra
Tech Sanction Details
Technical Sanction No. : 157 TS Sanction Date : 8/9/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost 15th Finance Commission MLA-LED scheme3 Total
152000 100000 0 0 77000 300000 0 477000 0 629000
Financial Sanction Details
Financial\Administrative Sanction No: 07/157 AS Financial\Administrative Sanction Date 1/11/2023
Fin. Sanc. Amt. (in Rs) NREGA:252000 15th Finance Commission
77000
MLA-LED
300000
Scheme 3
0
Total
629000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil36.468186.86812.2224
2Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil7.152369226405.184
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m35.46894.83362.3664
4Filling foundation and around masonry work with moorum I/c ramming layers and watering.28.8300.88663.04
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)22.166494143907.04
6Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime mortar 1:3 (1lime putty, 3sand)5.674493027972.82
7Add for masonry in supper structure above plinth level up to floor two level13.4155145.269022.858
8Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height530110.758671
9Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars2087.4786.6180774.902
1015mm thick cement plaster on rough side of wall in-Cement mortar 1:5 (1cement, 5sand)165.425183.430338.945
11Cement concrete flooring 1:2:4 (1cement, 2sand, 4graded stone aggregate, 20mm nominal size) laid in one layer and finished with floating coat of neat cement.-40 mm thick.213.42589.119016.1675
12Oil bound distemper of approved quality of any shade two coats on new works including priming coat.213.42589.119016.1675
13Painting with enamel paint, brushing, interior to give an even shade I/n cleaning the surface of all dirt dust and other foreign matter on steel and other metal surfaces.-2 coats35.39236.51291.808
14Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.13315033150
Total Activity 629000
S.NoMaterialQuantityUnit PriceTotal
1CEMENT (Beg)1100000100000
2Convergence Amount1377000377000
Total Material 477000