S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 7000 | 7000 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 17500 | 1.5 | 26250 |
3 | Contingency | 0 | 0 | 0 |
4 | Work charge | 0 | 0 | 0 |
5 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 135.8 | 19.8 | 2688.84 |
6 | Pumping out water caused by springs tidal or river seepage, broken water mains or drains or well point pumping and the like. | 83.04 | 48.3 | 4010.832 |
7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 1439.93 | 32.4 | 46653.732 |
8 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 19.3 | 2846.6 | 54939.38 |
9 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 4.26 | 2250.9 | 9588.834 |
10 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 11.496 | 1985.7 | 22827.6072 |
11 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size) | 21.933 | 3113.9 | 68297.1687 |
12 | False work for R.C.C. and P.C.C. work in plinth and foundation | 370.02 | 132.3 | 48953.646 |
13 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand) | 26.12 | 2175 | 56811 |
14 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 1305.6 | 63.9 | 83427.84 |
15 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars | 1174.86 | 54.8 | 64382.328 |
16 | Collection of approved soil having CBR not less than 5, including stacking at quarry. | 1200 | 102 | 122400 |
17 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 13.5 | 74.8 | 1009.8 |
18 | Transportation of metal | 1439.93 | 128.07 | 184411.8351 |
19 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms. | 16.74 | 171.27 | 2867.0598 |
20 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 8.11 | 300.28 | 2435.2708 |
21 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 50 Kms. and part there of upto 100 Kms. | 32.77 | 814.36 | 26686.5772 |
22 | Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock. | 9 | 258.36 | 2325.24 |
23 | Transportation rates for Col, fuel wood, iron work, steel G.I sheets paints, oils, pipes and machinery etc | 1.722 | 268.47 | 462.30534 |
24 | Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1200 mm dia. | 7.5 | 4263.4 | 31975.5 |
25 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 1222 | 20.4 | 24928.8 |
26 | Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact | 1200 | 20.4 | 24480 |
27 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 20.77 | 108.2 | 2247.314 |
28 | Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m | 85.084 | 126.93 | 10799.71212 |
29 | Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 6.0 m initial depth upto 10.5 m | 55.4 | 214.01 | 11856.154 |
30 | Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 10.5 m initial depth upto 15.0 m | 69.24 | 490.81 | 33983.6844 |
31 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 4223.64 | 73.4 | 310015.176 |
32 | Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Hard moorum | 0 | 0 | 0 |
33 | Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 20m And lift upto1.5m-Dense or hard soil. | 6100 | 6.3 | 38430 |
34 | Collection of hard moorum including stacking at quarry. | 1439.93 | 118.3 | 170343.719 |
35 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 4.5 | 137.6 | 619.2 |
36 | Transportion of metal | 0 | 0 | 0 |