Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:20:57 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: RICHHARIKALAN(P)
Work Code: 1703004083/RC/22012034292314 (kharanja nirman pooran kushwah ke makan se malgada ki or)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2015 Work start date : 5/12/2015
Present status : Earthern road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 83/2325 Sanction Date : 5/11/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
254269 132135 0 0 0 0 0 133000 0 386404
Financial Sanction Details
Financial\Administrative Sanction No: 83/117 Financial\Administrative Sanction Date 1/12/2015
Fin. Sanc. Amt. (in Rs) NREGA:386404 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
387000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep6000.3180
2Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.900226.1203490
3Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.399.165128.2551192.91125
4Loading of metal in truck, dumper etc.255.628.267223.256
5Unloading of metal in truck, dumper etc.255.614.133611.628
6Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.220.544.19724.05
7Collection of hard moorum including stacking at quarry.255.6140.735962.92
8Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Loose or soft soil.117013.816146
9contingency15915059150
Total Activity 387000
S.NoMaterialQuantityUnit PriceTotal
1contangency11110811108
2Display board150005000
3PhotoCopy & Stationary1001100
4खण्‍डा परिवहन155.8075399.16562192.9007375
5मुरम परिवहन (1)321.3462167.3153764.432722
Total Material 133000