S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 105.88 | 45 | 4764.6 |
2 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 10.67 | 99.6 | 1062.732 |
3 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:8 (1cement, 8sand) | 18.39 | 1945.2 | 35772.228 |
4 | Extra rates for quantities of work executed . in or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works) | 78.48 | 63.71 | 4999.9608 |
5 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work | 96.15 | 66.6 | 6403.59 |
6 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Well Work | 70.65 | 205.84 | 14542.596 |
7 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Well Work | 78.48 | 320.53 | 25155.1944 |
8 | contingency | 1 | 3714 | 3714 |
9 | Labour difference in case of old SoR | 589 | 22 | 12958 |