Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:03:15 PM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: SAKRAYA
Work Code: 1702001037/WC/22012034968101 (naveen dug pond nirman shamsan ghat ke pass sakaraya)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 16/4/2022 Work start date : 12/5/2022
Present status : Non-existent Proposed Status : Constr of Earthen Check Dam for Community
Tech Sanction Details
Technical Sanction No. : 1702001/2022-2023/96668/TS Sanction Date : 20/5/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
473972.36 218138.12 17125.45 7402.16 0 0 0 243000 0 716638.09
Financial Sanction Details
Financial\Administrative Sanction No: 1702001/2022-2023/96668/AS Financial\Administrative Sanction Date 21/5/2022
Fin. Sanc. Amt. (in Rs) NREGA:716634 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
717000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Loose or soft soil1807.007833333333331261.41
2(III) Lead upto 200 meters583.2116.64312414266168026.27
3(I) 1.50 m. to 3.00 m.135010.48356296296314152.81
4(II) 3.00 m to 4.50 m45018.368262
5(b) C.C. 1:3:6 (1cement, 3sand, 6metal)5.43202.6333333333317294.22
6(e) In Cement mortar 1:6 (1cement, 6sand)18.92899.0317460317554791.7
7Providing stone chips under stone pitching63457.81269841269828842.2
8(XXIX) 50 Km. Lead78.9807.86362484157263740.44
9Stripping the seat of embankment of all foreign materials, vegetation and other growth like grass grass roots etc. and removing and rubbish up to a suitable distance including dressing but excluding jungle clearance etc. complete.270158.36722222222242759.15
10Site clearance, cutting grass, raking into heaps and removing off the premises38502.8189142857142910852.82
11(b) Dense or hard soil (PT/45/45)21.6178.6759259259263859.4
1222cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum180379.20538888888968256.97
13Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry.36195.9419444444447053.91
14Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine.39603.6001792929292914256.71
15Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed.396079.0971742424242313224.81
Total Activity 717000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper1.0314885912.789
20084-Hire charges of Diesel truck - 9 tonne (without POL)11.4183387224225599.9153654
30367-Portland Cement2.944755551116228.544805
40982-Coarse sand (zone III)0.8438851028.16867.6488016
50983-Fine sand (zone IV)9.211591076.259913.9737375
61157-Stone for masonry work21.924519.7511394.999
71158-Stone for pitching 15 cm x 22.5 cm5431517010
81235-Diesel oil300.545763296820437.11190372
92903-Stone chippings/ screenings 4.75 mm nominla size6335722491
105001-Mobil oil10.74593856182.91965.432162624
11MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT4.6770755252455.464375
12MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)1.726926821177.75944
13MR6089-Hire Charges for tractor with ploughing arrangement including running expanses and driver17.8270812616.56
Total Material 144000