S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Contingency | 1 | 23500 | 23500 |
2 | Work charge | 595 | 11 | 6545 |
3 | Stacking without boxing.-Puddle earth, moorum, sand or kankar | 235 | 10.5 | 2467.5 |
4 | Transportation of metal | 233 | 119.88 | 27932.04 |
5 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms. | 45 | 152.37 | 6856.65 |
6 | Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact | 235 | 30.2 | 7097 |
7 | Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP: | 15 | 360 | 5400 |
8 | Collection of soft moorum including stacking at quarry. | 235 | 112.8 | 26508 |
9 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Loose or soft soil. | 12.8 | 600 | 7680 |