Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 05:39:05 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: KESUN
Work Code: 1725006028/WC/22012035064780 (amrit srovar tank forest compartment 25 kesun)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 6/4/2023 Work start date : 6/5/2023
Present status : Non-existent Proposed Status : Construction of Community Water Harvesting Ponds
Tech Sanction Details
Technical Sanction No. : 688 xx Sanction Date : 12/4/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Public Contribution scheme2 scheme3 Total
1400000 934000 0 0 0 0 0 934000 0 2334000
Financial Sanction Details
Financial\Administrative Sanction No: 2 xx Financial\Administrative Sanction Date 3/5/2023
Fin. Sanc. Amt. (in Rs) NREGA:2334000 Public Contribution
0
Scheme 2
0
Scheme 3
0
Total
2334000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.1870.97.0213133.718
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)4.923426.4916858.3308
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2.5:5 (1cement, 2.5 sand, 5metal)47.793830.98183082.5342
4False work for R.C.C. and P.C.C. work in plinth and foundation136.48187.825630.944
522cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014308.15608.1187386.015
6Providing stone chips under stone pitching525.42608.1319507.902
7Transportation of metal 115.59137.7315920.2107
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.146.67243.7135744.9457
9Rolling and consolidating water bound mecadam coat with any size of metal of any thickness upto 100mm thickness(including rolling screening or binding materials) including watering & filling in depressions which occur during the process with power roller-Including hire and running expenses of roller3355.0622.9376931.5258
10FOR EARTHEN DAM - Benching the seat of embankment over to an average depth of 15cm and cross slope of 1:12 including earth work removing the rubbish upto a distance of 50m including dressing.389.51172.8967342.3839
11FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc.243.71452.46110269.0266
12FOR EARTHEN DAM - Providing fitter blanket, horizontally, including laying, Spreading, packing etc. in layers of required thickness but excluding excavation of foundation.-Metal 80 mm nominal size139.16888123574.08
13FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders62.73897.5256301.4296
14Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.3355.0679.09265351.6954
15Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Tank Work60.47191.9111604.7977
16Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Tank Work472.89611.77289299.9153
17Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Tank Work288.77645.19186311.5163
18Lossening of hard soil by ploughing the existing gound3355.063.0510232.933
19Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed3355.0679.09265351.6954
20work charge17400074000
Total Activity 2334000
S.NoMaterialQuantityUnit PriceTotal
120 MM Matel35100035000
2BLACK COTTEN SOIL 2515035052500
3Blasting (No)15015022500
4Board160006000
5bolader20025050000
6CEMENT5035017500
7Centring & Shuttering501005000
8Diseal pump2875021000
9Hearting Soil3355145486475
10Lead of Casing Soil 0.50 Km50015075000
11pitching stone52510052500
12Sand20100020000
13Tanker30030090000
Total Material 934000