S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 1500 | 1500 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 1200 | 1.5 | 1800 |
3 | Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Loose or soft soil | 0 | 81 | 0 |
4 | ACT0307-(a) | 11.88 | 73.4 | 871.992 |
5 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 1200 | 0.4 | 480 |
6 | ACT1902-(b) | 372 | 81.27 | 30232.44 |
7 | ACT2008 | 372 | 80.1 | 29797.2 |
8 | FOR EARTHEN DAM - Benching the seat of embankment over to an average depth of 15cm and cross slope of 1:12 including earth work removing the rubbish upto a distance of 50m including dressing. | 85.19 | 81 | 6900.39 |
9 | Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Dense or hard soil | 85.19 | 81 | 6900.39 |
10 | Collection of hard moorum including stacking at quarry. | 372 | 118.3 | 44007.6 |