State: MADHYA PRADESH District: REWA Block: SIRMOUR Panchayat: BHATI GAWAN
Work Code: 1713003014/RC/22012034288402 (GSB Road Main Road Se Shayamlal Ke ghar ki Taraf)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2015 Work start date : 25/10/2015
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 874/72 Sanction Date : 21/10/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
864000 578000 0 0 0 0 0 578000 0 1442000
Financial Sanction Details
Financial\Administrative Sanction No: 103/72 Financial\Administrative Sanction Date 22/10/2015
Fin. Sanc. Amt. (in Rs) NREGA:1442000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1442000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard115001500
2Dag-beling-Single spade stroke minimum 75mm deep32000.2640
3Transportation of metal 800114.191280
4Transportation of metal 1183000183000
5Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making150021.532250
6Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor18002341400
7Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)180039.671280
8Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:223578.3128960.9
9Site clearance, cutting grass, raking into heaps and removing off the premises32001.65120
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.320060.2192640
11Collection of puddle earth including stacking at quarry800112.890240
121902 Transportion of metal2895208.4603318
Total Activity 1442000
S.NoMaterialQuantityUnit PriceTotal
120 mm metal transport10120012000
2Compaction of Earth Work190023.1143909
3Compaction of GSB120002000
4contangency and work charges13600036000
5contigency13600036000
6Rolling Earth & moorum190023.1143909
7Transportanion of hard Muram190023.1143909
8Transportanion of Soft Muram225023.1151997.5
9Transportation of GSB450291.21131044.5
10Transportation Of Selected Soi320023.2274304
11Transpotation Charges320021.2267904
12WATER TENKAR190018.2234618
Total Material 578000