State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: DEVRA
Work Code: 1713004041/RC/107 (ग्रेवल मार्ग निर्माण मगेंलश्‍वर सिहं के घर के पास )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 25/4/2012 Work start date : 25/10/2012
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 41/107 Sanction Date : 2/5/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
248000 147000 0 0 0 0 0 147000 0 395000
Financial Sanction Details
Financial\Administrative Sanction No: 0041/08 Financial\Administrative Sanction Date 2/5/2012
Fin. Sanc. Amt. (in Rs) NREGA:395000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
395000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Ordinary shrub jungle (areas below 25% covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting (for survey works)36000.51800
2Work charge601227320
3Dag-beling-Single spade stroke minimum 75mm deep15000.2300
4Collection of approved soil having CBR not less then 12, including stacking at quarry.16834768347
5Transportation of metal 498.672.0935944.074
6Korebandi for consolidation work.-30cm wide and 10cm thick.10001.91900
7Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN236.2564.215167.25
8Laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1200 mm dia.22.5772.417379
9Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor249317.443378.2
10Providing and fixing to wall, ceiling and floor 6.00kgf/sqcm working pressure polyethylene pipes of the following outside diameter low density complete with special flange compression type fitting wall clips etc. including making good the wall ceiling and-20 mm dia.2621.254.812582
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work249367.8169025.4
12SIGN BOARD115001500
13contingency110001000
14Labour difference in case of old SoR11879518795
Total Activity 395000
S.NoMaterialQuantityUnit PriceTotal
1contangency and work charges180008000
2Display board115001500
3earth worlk compaction212617.436992.4
4Gravel or moorum236.2539.69355.5
5pipe22.25722.716080.075
6Soil transport498.639.5919739.574
7Transportanion of Soft Muram236.2518042525
8Transportation of Water2621.254.812582
Total Material 147000