S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 36975 | 4.2168 | 155916.18 |
2 | Digging of planting pits for plantation work, sizes as per plant specification and plant height : | 223.256 | 55.1990987924177 | 12323.53 |
3 | Providing and filling pits with locally available Firm Yard Manure (FYM) as per planting specification : | 2450 | 31.33 | 76758.5 |
4 | Providing and spraying bio pesticides/ fungicides such as Neem Oil as per planting specification : | 2450 | 24.455 | 59914.75 |
5 | Filling of excavated earth in planting pit in layers not exceeding 20 cm in depth consolidating each deposited layers by ramming watering etc., : | 223.256 | 65.0491812090157 | 14522.62 |
6 | Cost of Planting of Mangifera Indica (Mango Grafted ) of height 60-75 cm at a spacing of not less than 4.5 X 4.5 m with pit size as per plant specification and types : | 2450 | 65 | 159250 |