The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 07:34:05 PM 
Back  
State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: DANGICHA
Work Code: 1719006032/DW/9993657000 (Samudayik kup khal me mahuwakhedi gp dangicha)
Work Category: Drinking Water
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2015 Work start date : 31/12/2015
Present status : Not Exist Proposed Status : DUGWELLS
Tech Sanction Details
Technical Sanction No. : 32/09/2015 Sanction Date : 4/12/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
314650 182850 0 0 0 0 0 183000 0 497500
Financial Sanction Details
Financial\Administrative Sanction No: 32/09/2015 Financial\Administrative Sanction Date 29/12/2015
Fin. Sanc. Amt. (in Rs) NREGA:497500 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
498000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Labour only for item no.0402141304230
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)3.712648.19824.451
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)3.712204.68179.066
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)13.83209.244286.96
5False work for R.C.C. and P.C.C. work in plinth and foundation302.44185.456072.376
6Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height11271.47996.8
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars870.1757.750208.809
8Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.000
9Extra rates for quantities of work executed . in or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)90.97177.7816172.6466
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work106.27130.313846.981
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work173.78209.2436361.7272
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Well Work125.646758655.2
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Well Work245.35759.5186343.325
14contingency153005300
Total Activity 498000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL14.2100014200
240 M.M. METAL3.348002672
3Blasting Holas10048048000
4Cement(bori)13128036680
5Centering and Shuttering302.4492.527975.7
6Contagecny150005000
7Mason Payment (Semi Skilled)182254050
8METAL000
9metal(t)000
10Sand8.8510008850
11sariya870.174034806.8
Total Material 183000