State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: DEVRA
Work Code: 1713004041/RC/22012034285028 (खेत सड़क प्रधानमंत्री मार्ग देवरा से जगमोहन कोल के घर तक )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2015 Work start date : 15/9/2015
Present status : No Road Proposed Status : Sand Moram
Tech Sanction Details
Technical Sanction No. : 518/41/11 Sanction Date : 7/7/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
495000 350000 0 0 0 0 0 350000 0 845000
Financial Sanction Details
Financial\Administrative Sanction No: 02/41/11 Financial\Administrative Sanction Date 28/7/2015
Fin. Sanc. Amt. (in Rs) NREGA:845000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
845000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard115001500
2Dag-beling-Single spade stroke minimum 75mm deep64000.21280
3Transportation of metal 1865114.1212796.5
4Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making360021.577400
5Site clearance, cutting grass, raking into heaps and removing off the premises64001.610240
6Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.320060.2192640
7Collection of puddle earth including stacking at quarry1865112.8210372
81902 Transportion of metal1138000138000
Total Activity 845000
S.NoMaterialQuantityUnit PriceTotal
1contangency and work charges13300033000
2HumePipes10540054000
3Rolling of Muram120021.2225464
4Rolling of Soil120021.2225464
5Soil transport120063.2775924
6Transpotation of Mooram120084.1100920
7Trasportaion of water180019.5235136
Total Material 350000